The new building has been arranged in a terrace of rooms opening off a spinal corridor connected to the existing building via a glazed link corridor.
Included in the new building are two Information Technology rooms, a large staff room and Craft Design Technology department and necessary supporting ancillary rooms.
The architectural character of the existing school rooms has been repeated in the new building.
All images and content are subject to copyright, © Steel Coleman Davis Partnership 2010